Recently Completed Projects
General Contractor: Austin Bridge & Road Location: SH 45, Section 8 @ US 183, Williamson County Contract Price: $1,717,080 Start Date: 12/22/03 - Completion Date: 11/30/08 Description: Metal Beam Guard Fence, T-4 & PR-1 Rail, Fence, Gates,Quadguards |
General Contractor: Granite/JD Abrams Joint Venture Location: SH 45 Section 7 from Parmer going East, Williamson County Contract Price: $1,220,443 Start Date: 02/16/04 - Completion Date: 05/18/07 Description: Soil Retention Blanket, Chainlink Fnce & Gates, Metal Beam Guard Fence |
General Contractor: Lone Star Infrastructure Location: SH 130 Seg 1, 2, 3 & 4 Contract Price: $4,708,026 Start Date: 04/04/05 - Completion Date: 07/07/09 Description: MBGF,Signs, Delineators, RipRap, Post & Cable Fence |
General Contractor: Hill Country Constructors Location: US 183-A Turnpike - fr US 183 @ RM 620 (SH 45) N - Travis & Williamson Co. Contract Price: $1,489,219 Start Date: 04/18/05 - Completion Date: 04/20/08 Description: Metal Beam Guard Fence,Signs, CL Fence, Gates, Bwire & Post/Cable Fence |
General Contractor: Capital Excavation Location: RM 2147 fr Slickrock Crk to Thanksgiving Mtn- Llano & Burnett County Contract Price: $565,760
Start Date: 07/10/06 - Completion Date: 02/03/08 Description: Silt Fence, Rock Filter Dams,Stab Const Entr, Rip Rap, MBGF |
General Contractor: Hunter Industries Location: SH 123 Guadelupe Co. Contract Price: $1,009,639 Start Date: 01/22/07 - Completion Date: 01/28/08 Description: Metal Beam Guard Fence, Mail Boxes, Delineators, Object Markers |
Current Projects
Texas Transportation Authority (TTA) Projects View Gallery
| General Contractor | Location |
| Zachary Gilbert Constructors | SH 45 Williamson County |
| Description: Metal Beam Guard Fence, Terminal Anchor Sections, Single Guard Rail, Extruder Terminals, Chain Link Fence, Vehicle Gates, Wire Fence, Rock Filter dams, Construction Exit, Gabions, Temp Sedmt Cont Fence, Quadgd Systems, Single Guardrail Terminals, Median Barrier Gates, Landscape Pavers. |
| Lone Star Infrastructure | SH 130 Williamson & Travis Co. |
| Description: Wire Fence, Gates, Perimeter Fence, Temporary Barbed Wire Fence, Emergency Guard Rail Repair, Broadcast Seeding, Drill Seeding, Mowing, Mulching, 5 Strand Barbed Wire Fence, Water Gaps, H-Bracing. |
| Austin Bridge & Road | SH 45 Section 8 @ US 183 |
| Description: T-4 Rail, PR 1 Rail, Metal
Beam Guard Fence, Transitions, Terminal Anchor Sections, Chain Link Fence, Gates, Wire Fence, Personal Safety Gates,
Quadguard Systems, Single Guard Rail Terminals, Median Barrier Gates, Bollards, Emergency Fence & Gate Repairs. |
| Granite/Abrams Joint Venture | SH 45 Section 7 from Parmer > East |
| Description: Single Guardrail Terminal, Chain Link Fence, Gates, Vehicle Gate, Wire Fence, Metal Beam Guard Fence, Terminal Anchor Section, T-4 Rail. C-4 Rail, Soil Retention Blanket, Drill Seeding, Block Sod, Fertilizer, Grouting, Temp Field Fence, Plated Terminal & Line Post. |
| Austin Bridge & Road | SH 45 Section 6 (fr SH 130 > West) |
| Description: Metal Beam Guard Fence, Terminal Anchor Sections, Single Guardrail Terminal, Personnel Safety Gate, Bollards, 5 Strand Barbed Wire Fence, 6' No-Climb Chain Link Fence, Chain Link Gate. |
| Lone Star Infrastructure | SH 130 Segments 1 & 2 |
| Description: RipRap Concrete Mow Strips,
Metal Beam Guard Fence, Terminal Anchor Sections, Transitions, Single Guard Rail Terminals,
Post & Cable Fence,
Small Road Sign Assemblies, Bridge Clearance Signs, Object Markers, Dead End Barricades,
Delineator Assemblies. |
| Joe Bland Construction | SH 130 Toll Booths Williamson/Travis |
| Description: Metal Beam Guard Fence, MBGF Transition - Thrie Beam, Terminal Anchor Sections, Single Guardrail Terminals, Quadguards. |
Texas Dept of Transportation (TXDOT) Projects View Gallery
| General Contractor | Location |
| Williams Brothers Construction |
IH 10 @ Callaghan, San Antonio, Bexar Co. |
| Description: Metal Beam Guard Fence, Transitions, Terminal Anchor Sections, Temp Sedmt Cont Fence, Landscape Pavers, Single Guard Rail Terminals, Rock Filter Dams, Soil Retention Blanket. |
| Archer Western Contractors |
US 183, Travis County |
| Description: Metal Beam Guard Fence, Transitions, Terminal Anchor Sections, Single Guardrail Terminals, Chain Link Fence, Cell Fib Seed, Fertilizer, Soil Retention Blanket, Broadcast Seeding, Ornamental Fencing. |
| Zachary Construction Corp. |
US 183 Williamson County |
| Description: Veh Imp Attn Assm Brls, Metal Beam Guard Fence, Terminal Anchor Sect., MBGF Trans Thrie Beam, Quadgd Sys, Chain Link Fence, Gates, Wire Fnc, Single Guardrail Term., Wire Fence, Median Barrier Gates, Vehicular Gates. |
| Trans Tech Electric, L.P. |
US 290 Corridor Traffic Management |
| Description: Broadcast Seeding, Soil Retention
Blanket, RipRap Concrete, Metal Beam Guard Fence, Terminal Anchor Sections, Delineator
Assemblies, Rock Filter Dams, Temp Sedmt Cont Fence, Single Guardrail Term., Saw Cut
Concrete and Haul off. |
| McCarthy Building Company |
IH 410 @ San Pedro, San Antonio/Bexar |
| Description: Broadcast Seed, Cell Fib Seed, Terminal Anchor Sections, Metal Beam Guard Fence, Rock Filter Dams, Construction Exits, Temp Sedmt Cont Fence, Single Guardrail Terminals, Quadguard Systems. |
| Texas Sterling Construction |
FM 969, Travis Co. |
| Description: Broadcast Seed, Fertilizer, Vegetative Watering, Soil Retention Blanket, PR-1 Rail, Metal Beam Guard Fence, Terminal Anchor Sections, Erosion Control Compost, Compost Manf Topsoil, Temporary Erosion Control Device Rock Filter Dams, Single Guardrail Terminals. |
| Chasco Contracting |
Parmer Lane Extension fr SH 29 > FM 3405 |
| Description: Broadcast Seed, Drill Seed, Fertilizer, Soil Retention Blanket, Metal Beam Guard Fence, Radius Rail, MBGF with Thrie Beam, Single Guardrail Term. |
| Lindsey Contractors |
SH 36, Coryell County |
| Description: Block Sod, Broadcast Seed, Drill Seed, Soil Retention Blanket, Metal Beam Guard Fence, Transition, Thrie Beam, Terminal Anchor Sections, Rock Filter Dams, Erosion Control logs, Temp Sedmt Cont Fence, Single GR Term. |
| Hunter Industries |
FM 3407 Hays County |
| Description: Cell Fib Seed, Soil Retention Blanket, MSE Retaining Wall, T-501 Rail, Rock Filter Dams, Construction Exit, Temp Sedmt Cont Fence, Quad Sys, REACT 350, TECD Compost Logs. |
| Hill Country Constructors |
US 183-A Turnpike |
| Description: Metal Beam Guard Fence, Transition - Thrie Beam, Single Guardrail Term., Chain Link Fence, Vehicular Gate, Post & Cable Fence, Terminal Anchor Sect., Barbed Wire Fence, Woven Wire Fence, Gates, Non-Climb Fence. |
| Williams Brothers Construction |
IH 410 @ US 281, Bexar Co. |
| Description: TY C201 Rail, Chain Link Fence, Vehicular Gate, Rock Filter Dams, Gabion, Temp Sedmt Cont Fence, Landscape Pavers, Block Sod, Cell Fib Seed, Fertilizer, Soil Retention Blanket, Live Oak (2" Cal), Vegetative Watering, Planting Bed Prep, Compost Manufactured Topsoil-6". |
| RGM Constructors, L.P. |
A.W. Grimes Boulevard Ph-2, Round Rock |
| Description: Block Sod, Cell Fib Seed, Hay/Straw Seed, Vegetative Watering, Soil Retention Blanket, Class B Concrete Flume, TY-PR Rail, Rock Filter Dams, Construction Exit, Metal Beam Guard Fence Transition, Terminal Anchor Section, Guardrail End Treatment, Tree Protection: Chain Link, Mulch, Watering. |
| Joe Bland Construction |
CR 163 - Nutty Brown Road Reconstruction |
Description: Cell Fib Seedm Broadcast Seed, Soil Retention Blanket, Metal Beam Guard Fence, Terminal Anchor Section, Gate, Wire Fence, Rock Filter Dams, Temp Sedmt Cont Fence, Single Guardrail Terminal. |
| RGM Constructors, L.P. |
Wimberley ByPass Construction |
| Description: Cell Fib Seed, Broadcast Seed, Vegetative Watering, Soil Retention Blanket RipRap Stone, Metal Beam Guard Fence, Terminal Anchor Section, Gate, Wire Fence, Rock Filter Dams, Construction Exits, Temp Sedmt Cont Fence, Single Guardrail Term., Wire Fence, Drill Seed. |
| Hunter Industries |
US 59, Goliad County |
| Description: Metal Beam Guard Fence, Terminal Anchor Section, MBGF Transition Thrie-Beam, Guard Rail End Treatment, FASTRACC, ABSORB 350, Chain Link Fence, Wire Fence, Post & Cable Fence, Gate TY-3. |
| Capital Excavation Co. |
SPUR 98, Kerr County |
| Description: Silt Fence, Rock Berms,Rock Filter Dams, Soil Retention Blanket, Concrete Curb, Rock Riprap. |
| Hunter Industries, Ltd. |
FM 1863, Comal Co. |
| Description: Metal Beam Guard Fence, MBGF w/Transition Thrie-Beam, Guardrail End Treatment, Quadguard, Crash Cushion Attenuator SFPM-17 Barrel Assem. |
| Capital Excavation Co. |
IH 35 @ RM 150 Hays County |
| Description: Broadcast Seed, Drill Seeding, Rock Filter Dams, Temp Sedmt Conf Fence, Rock Filter Dams, Metal W-Beam Guard Fence, MBGF Transition Thrie Bm, Guardrail End Treatment, Crash Cushion Attenuator REACT |
| Capital Excavation Co. |
RM 2147, Llano County |
| Description: Riprap Stone, Rock Filter Dams, Construction Exits, Metal W-Beam Guard Fence, Terminal Anchor Sections, Guardrail End Treatments. |
| Zachary Construction |
IH 35, Bell County |
| Description: TY T-4 (S) Rail, TY C-4 (S) Rail, TY ADA Handrail, TY T-401 (Mod) Rail, TY T-402 (Mod) Rail, TY C-402 (Mod) Rail, Metal Beam Guard Fence, Terminal Anchor Sections, MBGF Transition Thrie Beam, GDRail End Trt Crash Cushion Atten TRACC, SHORT TRACC, Chain Link Fence -PVC-Coat |
| Texas Sterling Construction |
Loop 410, Bexar County |
| Description: Temp Sedmt Cont Fence, Terminal Anchor Section, Metal Beam Guard Fence, MBGF Trans Thrie-Bm, G'drail End Treatment, Crash Cushions, Delineators, Fence, Gates, Rock Berms, Construction Entr., Block Sod, Biodegrad Erosion Control Logs. |
| Project Scope | Location |
| St. Edwards University | Austin, Texas |
Description: Water Quality & Detention Pond
|
Past Projects
Texas
General Contractor: Austin Bridge & Road Location: SH 45, Section 8 @ US 183, Williamson County Contract Price: $1,717,080 Start Date: 12/22/03 - Completion Date: 11/30/08 Description: Metal Beam Guard Fence, T-4 & PR-1 Rail, Fence, Gates,Quadguards |
General Contractor: Granite/JD Abrams Joint Venture Location: SH 45 Section 7 from Parmer going East, Williamson County Contract Price: $1,220,443 Start Date: 02/16/04 - Completion Date: 05/18/07 Description: Soil Retention Blanket, Chainlink Fnce & Gates, Metal Beam Guard Fence |
General Contractor: Lone Star Infrastructure Location: SH 130 Seg 1, 2, 3 & 4 Contract Price: $4,708,026 Start Date: 04/04/05 - Completion Date: 07/07/09 Description: MBGF,Signs, Delineators, RipRap, Post & Cable Fence |
General Contractor: Hill Country Constructors Location: US 183-A Turnpike - fr US 183 @ RM 620 (SH 45) N - Travis & Williamson Co. Contract Price: $1,489,219 Start Date: 04/18/05 - Completion Date: 04/20/08 Description: Metal Beam Guard Fence,Signs, CL Fence, Gates, Bwire & Post/Cable Fence |
General Contractor: Capital Excavation Location: RM 2147 fr Slickrock Crk to Thanksgiving Mtn- Llano & Burnett County Contract Price: $565,760
Start Date: 07/10/06 - Completion Date: 02/03/08 Description: Silt Fence, Rock Filter Dams,Stab Const Entr, Rip Rap, MBGF |
General Contractor: Hunter Industries Location: SH 123 Guadelupe Co. Contract Price: $1,009,639 Start Date: 01/22/07 - Completion Date: 01/28/08 Description: Metal Beam Guard Fence, Mail Boxes, Delineators, Object Markers |
| Interstate Highway 35 @ Riverside Drive in Austin, Texas - Retaining Wall installed for Capital Excavation Co. and the Texas Department of Transportation |
| South First Street Extension in Austin, Texas - Mechanincally Stabilized Earth Wall installed for the City of Austin |
| Interstate Highway 35 - Widening from Georgetown to Bell Co. line, Texas installing revegetation, soil retention blanket and erosion controls for Granite Construction and the Texas Department of Transportation |
| Ben White Interchange at IH 35 and US 290 in Austin, Texas - Installing guardrails, fencing, revegetation, soil retention blankets and erosion controls for J.D. Abrams Construction and the Texas Department of Transportation. |
Out of State
| New Orleans, Louisiana - Gabion Mattresses in for Davis Pond for US Army Corps of Engineers, New Orleans District; Flood Control of Mississippi & Tributaries Delta Region Weeks Marine |
Henryetta, Oklahoma - Gabion Wall in Channel at the Wal-Mart in Henryetta, OK for Chance Construction
|
|
 |